Scope of works
G3 is a 28-storey Build-to-Rent building within the Wood Wharf masterplan on a brownfield site adjacent to Canary Wharf.
Kilnbridge were contracted to deliver the following scope:
- Unexploded Ordnance (UXO) magnetometer testing using 20 tonne track-truck Cone Penetration Testing (CPT) unit
- Construction of a sheet pile cofferdam using 11.5m long PU18-1 piles across 160m total length
- Installation of steel wailer beams
- Installation of ground anchors (21 in total)
- Support of existing historic dock wall with temporary works
- Excavation to 6m depth and disposal of 4,500m³ of arisings.
Kilnbridge successfully managed LUL interfaces as well as all live construction traffic during the works.
Challenges / Achievements
- Extremely challenging 12-week programme completed ahead of finish date
- In-house design of all elements of the cofferdam from client’s concept drawings
- Successfully coordinated and managed specialist subcontractors to meet programme