Scope of works
Kilnbridge were contracted to undertake demolition of a 6-span dual carriageway road bridge made redundant by the new A14 highway project. The bridge spanned over the East Coast rail line, Huntington Railway Station, and B1514 Brampton Road.
The bridge was constructed from post tensioned reinforced concrete, with additional heavy-duty structural steelwork elements which were introduced as strengthening part way through the lifespan of the bridge.
The project included removal of the following key elements :
The project was particularly challenging due to the close proximity of the live rail and highway infrastructure. Whilst undertaking works in these areas Kilnbridge worked hand in hand with the client and stakeholders to plan, manage, and safely undertake both rail and highway possession works in a timely and considerate manner.