PROJECT

Wood Wharf – Water Street Bridge

The project entailed the construction of the Water Street Causeway and both bridge abutments to enable the installation of a single leaf bascule bridge connecting Montgomery Street and Wood Wharf.
Sector National InfrastructureMaritime
Expertise Design & Engineering
Customer Canary Wharf Group
Location Canary Wharf, London

Scope of works

The project entailed the construction of the Water Street Causeway and both bridge abutments to enable the installation of a single leaf bascule bridge connecting Montgomery Street and Wood Wharf.

Kilnbridge delivered this project, now known as Water Street Bridge, through a number of in-house businesses and support hubs, including design, detailing and fabrication of all temporary Works.

In view of the restricted access to the site, Kilnbridge set-up a temporary on-site pre-cast concrete yard to manufacture and install 40 tonne precast panels

Kilnbridge’s scope also included the installation of precast U-beams, precast planks, precast split edge beams and in-situ toppings to tie all elements together using a 160 tonne crawler crane tracked on a fabricated steel grillage. The advantage of the grillage system was to avoid using a crane on a barge and four support vessels which would have been required in that situation. The adopted Kilnbridge cranage solution had a far lesser environmental impact with reduced CO2 emissions.

Challenges / Achievements

  • Winner of the 2018 Temporary Works Initiative at the British Construction Industry Awards
  • Winner of the Infrastructure Project of the Year at the 2019 UK Tekla Awards
  • Project of the Year by a specialist subcontractor (£3m to £5m value) at the 2019 Construction News Awards