The Grove School

KEY FACTS

LOCATION: Duckett's Green, London
CONTRACTOR: Kier Construction London
CLIENT: Kier Construction London
VALUE: £650,000
SECTORS: Commercial, mixed use, residential and retail
SERVICES: Demolition and Civil Engineering

Kilnbridge was awarded the strip out, demolition, structural alteration and general builders’ work package as a sub-contractor at the Grove School. Our scope of work consists of the demolition of an existing 1950s ancillary building and structural alterations to a building from the late Victorian period.

The Grove School 3.jpg
The Grove School 2.jpg
The Grove School 1.jpg
The Grove School 4.jpg

Our main activities includes the following:

  • Temporary works design
  • Full strip out of all non-structural material
  • The demolition of internal load-bearing walls
  • The installation of new steel beams including padstones
  • The removal of the central staircases for a new layout
  • The installation of new composite steelwork to form a new lift shaft
  • The installation of multi-decking and all external works

The project commenced in September 2018 with a twenty-one week programme.