The Grove School

KEY FACTS

LOCATION: Duckett's Green, London
CONTRACTOR: Kier Construction London
CLIENT: Kier Construction London
VALUE: £650,000
SECTORS: Commercial, mixed use, residential and retail
SERVICES: Demolition and Civil Engineering

Kilnbridge was awarded the strip out, demolition, structural alteration and general builders’ work package as a sub-contractor at the Grove School. Our scope of work consists of the demolition of an existing 1950s ancillary building and structural alterations to a building from the late Victorian period.

The Grove School 3.jpg
The Grove School 2.jpg
The Grove School 1.jpg
The Grove School 4.jpg

Our main activities on the project included the following:

  • Temporary works design.
  • Full strip out of all non-structural material.
  • The demolition of internal load-bearing walls.
  • The installation of new steel beams including padstones.
  • The removal of the central staircases for a new layout.
  • The installation of new composite steelwork to form a new lift shaft.
  • The installation of multi-decking and all external works.

The project commenced in September 2018 with a twenty-one week programme.