MSCP East Phase 1

The new MSCP (Multi Story Car Park) Phase 1 at Heathrow Airport represents a significant project completed as part of BAA’s continued capital works investment programme.

Kilnbridge were appointed by Laing O’Rourke to undertake the passive fire protection package for the new car park.

MSCP East Phase 1

Key Facts

Location:
Terminal 2
Heathrow Airport
Contractor:Laing O’Rourke
Construction
Client:BAA
ServicesFire Protection

We were engaged by Laing O’Rourke to develop the design brief for the fire protection package. One particular challenge presented was the requirement to develop and install a specialist fire and waterproof expansion seal to provide dynamic joint protection to the building movement joints.

The final design included fire stopping to achieve a range of fire ratings from 1 to 4 hours, acoustic requirements, air pressure requirements and building movements as set out in the Fire Strategy and Acoustic Specification.

MSCP East Phase 1 a